- IOT based Power tools
- Assembly time of 75 mins
- Handy and accessible material movement and tools
Integrated Bogie Assembly Line
Information
Assembly of LHB bogie lines in railway production units as well as overhauling workshops. A bogie disassembly line is also provided in repair workshops.