Godrej Enterprises Group

Integrated Bogie Assembly Line

Integrated Bogie Assembly Line

Inquire

Integrated Bogie Assembly Line

Inquire

Information

Assembly of LHB bogie lines in railway production units as well as overhauling workshops. A bogie disassembly line is also provided in repair workshops.

  • IOT based Power tools
  • Assembly time of 75 mins
  • Handy and accessible material movement and tools

Recently seen

Integrated Bogie Assembly Line

Integrated Bogie Assembly Line - 1
Integrated Bogie Assembly Line - 2